Paradip Refinery Project (AVU Heater Package), Paradip, Orissa
Paradip Refinery Project (AVU Heater Package), Paradip, Orissa
Client: Indian Oil Corporation Limited

BRIEF SCOPE OF WORK: Residual Process  Outline Design, Detailed Engineering, Site Survey, Procurement, Supply, Fabrication, Inspection by Third Party Inspection Agency (TPIA) as applicable,Transportation of all Equipment Material to work site, Storage, Materials Management, Construction, Assemblyand Installation, obtaining all necessary Statutory Approvals, Testing, Pre-Commissioning, Assistance with Commissioning, Start-up and Performance GuaranteeTest Run (PGTR) Including Total Project Management andHanding Over of Complete AVU Fired Heaters on a SinglePoint responsibility basis for Paradip Refinery Project, Paradip.

YEAR OF COMPLETION: 2013

Paradip Refinery Project (VGO – DHDT Heater Package), Paradip, Orissa
Paradip Refinery Project (VGO – DHDT Heater Package), Paradip, Orissa
Client: Indian Oil Corporation Limited

BRIEF SCOPE OF WORK: Review of Thermal Design, Mechanical Design, Detailed Engineering, Procurement, Supply, Fabrication, Erection and all tests as per specifications including all connected civil & structural (Excl. Piling & foundation) and other works including commissioning and Performance Guarantee test runs(PGTR) of Fired Heater DHT Reactor Feed Heater(Equipment Nos. 020-F-002), MHC 1st train Reactor Feed Heater (Equipment Nos. 021-F..(I01) and MHC 2ndTrain Reactor Feed Heater (Equipment Nos. 022-F-001) and Performance Guarantee Test runs (PGTR) of above Fired Heaters for VGO-DHDT unit of Paradip Refinery Project, Orissa.

YEAR OF COMPLETION: 2013

Paradip Refinery Project (NHT – CCR Heater Package), Paradip, Orissa
Paradip Refinery Project (NHT – CCR Heater Package), Paradip, Orissa
Client: Indian Oil Corporation Limited

BRIEF SCOPE OF WORK: Residual Process  Outline Design, Detailed Engineering, Site Survey, Procurement, Supply, Fabrication, Inspection by Third Party Inspection Agency (TPIA) as applicable, Transportation of all Equipment Material to work site, Storage, Materials Management, Construction, Assembly and Installation, obtaining all necessary Statutory Approvals, Testing, Pre-Commissioning, Assistance with Commissioning, Start-up and Performance Guarantee Test Run (PGTR) Including Total Project Management and Handing.
Over of Complete NHT/CCR Heaters on a Single Point responsibility basis for Paradip Refinery Project, Paradip.

YEAR OF COMPLETION: 2014

Guru Gobind Singh Refinery Project, HMEL, Bathinda, Punjab
Guru Gobind  Singh Refinery Project, HMEL, Bathinda, Punjab
Client: HPCL - Mittal Energy Limited

BRIEF SCOPE OF WORK: CDU/VDU, DHDT & NHT/CCR  Heaters Works of HMEL, Bathinda Refinery Project

YEAR OF COMPLETION: 2011

KEY ACHIEVEMENT: EPC Project with In- House Engineering and successful completion of heaters with commissioning assistance to the client.

Reactor Erection at DHDT HGU Project IOCL, Weight R01 668 MT, R02 791 MT, Vadodara, Gujarat
Reactor Erection at DHDT  HGU Project IOCL, Weight R01  668 MT, R02 791 MT, Vadodara, Gujarat
Client: Indian Oil Corporation Limited

BRIEF SCOPE OF WORK: Reactor Erection at DHDT – HGU Project IOCL, Weight R01 – 668 MT, R02 – 791 MT) for a Refining Capacity  DHDT -  2.2 MM PER ANNUM at IOCL,Vadodara, Gujarat.

YEAR OF COMPLETION: 2011

Fired Heaters Works For HCU DHDT for Bharat Oman Refineries Limited, Bina (M.P.)
Fired Heaters Works For HCU  DHDT for Bharat Oman Refineries Limited, Bina (M.P.)
Client: Bharat Oman Refineries Limited

BRIEF SCOPE OF WORK: HCU/DHDT Heater Works of BORL, Bina Refinery Project Residual Engineering, Structural Design, Fabrication (including supply of materials / components / items as required), inspection & erection and testing of Fired Heater system for HCU/DHT for Bina Refinery Project of  Bharat Oman Refineries Limited at Bina, Madhya Pradesh, India.

YEAR OF COMPLETION: 2010

KEY ACHIEVEMENT: Successful completion and commissioning of EPC of 5 heaters with In-House Engineering.
Structure  - 1800 MT
Piping - 22000 ID

NCU & MEG Project, IOCL, Panipat, Haryana
NCU & MEG Project, IOCL, Panipat, Haryana
Client: Indian Oil Corporation Limited

BRIEF SCOPE OF WORK: Piping, Equipment Erection, Heavy Lifting, Steel Structure & Painting Work of IOCL, NCU & MEG Project at Panipat.

YEAR OF COMPLETION: 2010

KEY ACHIEVEMENT: Fabrication & Erection of P91 Pipes (4400 ID), one of the most delicate piping work in construction field.

The Only agency Carrying out the Entire structural, Under Ground & Above ground Piping work and Equipment Erection Including 890 MT and 92 mtrs height of  Wash Tower for MEG Project at IOCL Panipat which is incidentally one of the most heaviest one in the IOCL Panipat Refinery.